Measuring Performance and Benchmarking Project Management at the Department of Energy uploaded below

Question 1

Conduct research using the Internet and identify the type of software or management tools that you would utilize to help with each of the major steps in developing the project plan.  Summarize the software/suite selected and identify its key capabilities, advantages and disadvantages. Answer must be 400 words not including references.

Question 2

Please read the article: “Measuring Performance and Benchmarking Project Management at the Department of Energy uploaded below,” and address the following items:

a. What’s your understanding of this statement from Peter Drucker on p. 21: “Management theory and practice have long established a link between effective performance measures and effective management.” Please share your thoughts.

b. Explain the difference between internal and external benchmarking relative to measuring project performance. Answer must be 400 words not including references.

find the cost of your paper

When Kuwait put pressure on the foreign oil companies in the late 1970s, what affect it had on the Global Oil market and politics?

Case Study instructions 1. When Kuwait put pressure on the foreign oil companies in the late 1970s, what affect it had on the Global Oil market and politics? 2. Who….

The Smartphone Industry

The module for this assignment is Applied Strategy, this assignment is about the industry analysis of the smartphone industry. You should include in an A2 poster the industry’s competitive characteristics….

Event management within the tourism industry

1/Introduction2/Discussion of Relevant Literature3/MethodologySent by 10th of November 4/Results5/InterpretationSent by the 30th of November 6/Conclusion7/References8/AppendixSent by the 15th of December